Avoided Cost Rate

Download the Avoided Cost Rate (PDF)

Effective: January 1, 2024

Applicability

This schedule is applicable to electric generation resources connected to the Cooperative’s electric system and whose output is sold to the Cooperative at the Cooperative’s avoided cost rate.

Availability

This schedule applies to members of SREC who sell the electric output from electric generation resources connected to the Cooperative’s electric system in accordance with the Cooperatives Net Metering or Interconnection Policies.

Rate

Year $kW $kWh
2024 NA $0.0405

Fees

  • Membership – $10
  • Disconnect Notice – $25
  • Returned Check – $20
  • Account Research/Special Handling – $30 per hour ($10 minimum)
  • Outages - Customer Equipment  – Actual Cost
  • Account Activation – $15
  • Connect charge - Office hours – $25
  • Connect charge - Overtime hours – Actual Cost
  • Disconnect charge:
    • At member’s request – Office hours – $0
    • At member’s request – Overtime hours – Actual Cost
  • Idle Service Fee – Access Charge Billed Monthly

Other fees may apply under special circumstances.

Authorization Date: December 20, 2023
Issued By: Salmon River Electric Cooperative, Inc. Board of Directors
Effective Date: January 1, 2024