This schedule is applicable to electric generation resources that are located on the Cooperative’s electric system and whose output is wheeled across the Cooperative’s electric system and sold to another party.
Availability
This schedule is available to members of SREC who sell the electric output from electric generation resources connected to the Cooperative’s electric system to another party and that is wheeled across the Cooperative’s electric system in accordance with the Cooperatives Interconnection Policy.
Rate
Year
$kW
$kWh
2023
$1.979
NA
Fees
Membership – $10
Disconnect Notice – $25
Returned Check – $20
Account Research/Special Handling – $30 per hour ($10 minimum)
Outages - Customer Equipment – Actual Cost
Account Activation – $15
Connect charge - Office hours – $25
Connect charge - Overtime hours – Actual Cost
Disconnect charge:
At member’s request – Office hours – $0
At member’s request – Overtime hours – Actual Cost
Idle Service Fee – Access Charge Billed Monthly
Other fees may apply under special circumstances.
Authorization Date: December 28, 2022 Issued By: Salmon River Electric Cooperative, Inc. Board of Directors Effective Date: January 1, 2023
This schedule is applicable to electric generation resources connected to the Cooperative’s electric system and whose output is sold to the Cooperative at the Cooperative’s avoided cost rate.
Availability
This schedule applies to members of SREC who sell the electric output from electric generation resources connected to the Cooperative’s electric system in accordance with the Cooperatives Net Metering or Interconnection Policies.
Rate
Year
$kW
$kWh
2023
NA
$0.0272
Fees
Membership – $10
Disconnect Notice – $25
Returned Check – $20
Account Research/Special Handling – $30 per hour ($10 minimum)
Outages - Customer Equipment – Actual Cost
Account Activation – $15
Connect charge - Office hours – $25
Connect charge - Overtime hours – Actual Cost
Disconnect charge:
At member’s request – Office hours – $0
At member’s request – Overtime hours – Actual Cost
Idle Service Fee – Access Charge Billed Monthly
Other fees may apply under special circumstances.
Authorization Date: December 28, 2022 Issued By: Salmon River Electric Cooperative, Inc. Board of Directors Effective Date: January 1, 2023
Service under this schedule is applicable strictly to the three-phase electric service provided to Hecla Mining Company at its Mine Substation located near Jordan Creek.
Availability
Service under this schedule is available at the Mine Substation where SREC interconnects at the terminal of the SREC 69 kilovolt (kV) power line at the Mine Substation. Total metered demand shall not exceed 2500 kW. Service is available under the terms specified in the June 1, 1998, Electric Service Agreement as may be modified or replaced, and the most current Three Phase Hecla rate schedule.
Type of Service
The type of service provided under this schedule is three-phase, alternating current at a nominal frequency of 60 Hz and a nominal voltage of approximately 69,000 volts.
Meter Read
Meters will be read by the Cooperative beginning on the 24th of each month at midnight.
Billing Demand
The Billing Demand is the average kW supplied during the rolling 15-minute period at maximum use during the billing period, adjusted for Power Factor.
Phase Protection
The Cooperative will not be responsible for damage to member’s equipment caused by the loss of one or more phases serving member’s equipment. It is the member’s responsibility to obtain and install adequate phase protection for all three- phase motors.
Monthly Charge
The Monthly Charge is the sum of the Access Charge and kWh charge at the following rates:
Access Charge
Billing Demand
Kilowatt-hour (kWh) Charge
SREC Rate Designation
$6557
$3.26
$0.0421
760
Power Factor:
Where the member’s Power Factor is less than 97%, as determined by measurement under actual load conditions, the Cooperative may adjust the kW measured to determine the billing demand by multiplying the measured kW by 97% and dividing by the actual Power Factor.
Minimum Charge
The monthly minimum charge shall be the Access Charge collected over 12 months.
Abandoned Service
Should a member’s service be physically disconnected for a continuous 12-month period, the Cooperative reserves the right to physically retire the service anytime thereafter.
Fees
Membership – $10
Disconnect Notice – $25
Returned Check – $20
Account Research/Special Handling – $30 per hour ($10 minimum)
Outages - Customer Equipment – Actual Cost
Account Activation – $15
Connect charge - Office hours – $25
Connect charge - Overtime hours – Actual Cost
Disconnect charge:
At member’s request – Office hours – $0
At member’s request – Overtime hours – Actual Cost
Idle Service Fee – Access Charge Billed Monthly
Other fees may apply under special circumstances.
Authorization Date: September 22, 2022 Issued By: Salmon River Electric Cooperative, Inc. Board of Directors Effective Date: December 25, 2022
Service under this schedule is applicable to services that are three phase, standard voltage, and supplied through one point of delivery for farm and ranch members for the operation of irrigation pump motors. If service is provided at primary voltage, the contract for service shall specify the point of delivery, establish all metering costs to be paid by the member, and delineate ownership and control of such facilities.
Availability
Service under this schedule is available at points on the Cooperative’s interconnected system where existing facilities of adequate capacity and desired phase and voltage are available, and additional investment by the Cooperative for new transmission, substation, or terminal facilities is not necessary to supply the desired service.
Irrigation is a seasonal rate which begins with the member’s meter reading for the April billing cycle and ends with the member’s meter reading for the October billing cycle (March 25th through October 24th).
If electric service is not going to be used anytime during the irrigation season, the Cooperative will be notified so that electric service can be disconnected. Service that has been disconnected for the season will be subject to the idle service fee. Irrigation service used anytime throughout the irrigation season will be subject to paying the Minimum Charge in addition to the charges for any power used.
Meter Read
Meters will be read by the Cooperative beginning on the 24th of each month at midnight.
Billing Demand
The Billing Demand is the average kW supplied during the rolling 15-minute period at maximum use during the billing period.
Phase Protection
The Cooperative will not be responsible for damage to member’s equipment caused by the loss of one or more phases serving member’s equipment. It is the member’s responsibility to obtain and install adequate phase protection for all three phase motors.
Monthly Charge
The Monthly Charge is the sum of the Access Charge and kWh charge at the following rates:
*Customer Class
Access Charge May through September (5 total billing cycles)
Billing Demand
Kilowatt-hour (kWh) Charge
SREC Rate Designation
0 to 30 kW
$325
$2 per kW
$0.041 per kWh
624
31 to 90 kW
$800
$2 per kW
$0.041 per kWh
626
91 to 170 kW
$825
$2 per kW
$0.041 per kWh
628
Above 170 kW
$860
$2 per kW
$0.041 per kWh
630
Note: *The customer class is set by the customer’s peak demand load during the prior irrigation season or calculated for a new irrigation service. The Cooperative may adjust the customer class during the current irrigation season if significant changes have occurred.
Minimum Charge
The monthly minimum charge shall be the Access Charge collected over 12 months.
Abandoned Service
Should a member’s service be physically disconnected for a continuous 12-month period, the Cooperative reserves the right to physically retire the service anytime thereafter.
Non-Seasonal Use
This service is available October 25th through March 24th upon prior approval of SREC management. The total connected load shall be no more than 100 amps. Requests for non-seasonal use must be made prior to the conclusion of the current irrigation season or a $25 connect fee may be applied. Charges for non-seasonal use follow: 1-time charge of $30 billed in the April billing cycle; and power (kWh) billed at the irrigation rate in the April billing cycle.
Fees
Membership – $10
Disconnect Notice – $25
Returned Check – $20
Account Research/Special Handling – $30 per hour ($10 minimum)
Outages - Customer Equipment – Actual Cost
Account Activation – $15
Connect charge - Office hours – $25
Connect charge - Overtime hours – Actual Cost
Disconnect charge:
At member’s request – Office hours – $0
At member’s request – Overtime hours – Actual Cost
Idle Service Fee – Access Charge Billed Monthly
Other fees may apply under special circumstances.
A 1% franchise fee has been imposed by the City of Challis on all Cooperative members whose point of electric delivery is within the corporate boundaries of the City of Challis, Idaho. This fee will be collected by the Cooperative for the benefit of the City of Challis as specified by City of Challis ordinance.
Authorization Date: September 22, 2022 Issued By: Salmon River Electric Cooperative, Inc. Board of Directors Effective Date: December 25, 2022
Service under this schedule is applicable to services that are single phase, standard voltage, and supplied through one point of delivery for farm and ranch members for the operation of irrigation pump motors no greater than 10 horsepower in rating.
Availability
Service under this schedule is available at points on the Cooperative’s interconnected system where existing facilities of adequate capacity and desired phase and voltage are available, and additional investment by the Cooperative for new transmission, substation, or terminal facilities is not necessary to supply the desired service.
Irrigation is a seasonal rate which begins with the member’s meter reading for the April billing cycle and ends with the member’s meter reading for the October billing cycle (March 25th through October 24th).
If electric service is not going to be used anytime during the irrigation season, the Cooperative will be notified so that electric service can be disconnected. Service that has been disconnected for the season will be subject to the idle service fee. Irrigation service used anytime throughout the irrigation season will be subject to paying the Minimum Charge in addition to the charges for any power used
Meter Read
Meters will be read by the Cooperative beginning on the 24th of each month at midnight.
Monthly Charge
The Monthly Charge is the sum of the Access Charge and kWh charge at the following rates:
Access Charge
Kilowatt-hour (kWh) Charge
SREC Rate Designation
$120 per month
$0.042 per kWh
621
Minimum Charge
The monthly minimum charge shall be the Access Charge collected over 12 months.
Abandoned Service
Should a member’s service be physically disconnected for a continuous 12-month period, the Cooperative reserves the right to physically retire the service anytime thereafter.
Non-Seasonal Use
This service is available October 25th through March 24th upon prior approval of SREC management. The total connected load shall be no more than 100 amps. Requests for non-seasonal use must be made prior to the conclusion of the current irrigation season or a $25 connect fee may be applied. Charges for non-seasonal use follow: 1-time charge of $30 billed in the April billing cycle; and power (kWh) billed at the irrigation rate in the April billing cycle.
Fees
Membership – $10
Disconnect Notice – $25
Returned Check – $20
Account Research/Special Handling – $30 per hour ($10 minimum)
Outages - Customer Equipment – Actual Cost
Account Activation – $15
Connect charge - Office hours – $25
Connect charge - Overtime hours – Actual Cost
Disconnect charge:
At member’s request – Office hours – $0
At member’s request – Overtime hours – Actual Cost
Idle Service Fee – Access Charge Billed Monthly
Other fees may apply under special circumstances.
A 1% franchise fee has been imposed by the City of Challis on all Cooperative members whose point of electric delivery is within the corporate boundaries of the City of Challis, Idaho. This fee will be collected by the Cooperative for the benefit of the City of Challis as specified by City of Challis ordinance.
Authorization Date: September 22, 2022 Issued By: Salmon River Electric Cooperative, Inc. Board of Directors Effective Date: December 25, 2022
This schedule is applicable to services that are single phase, standard voltage, and supplied through one point of delivery to a master-metered mobile home park or RV park for general domestic uses, including single phase motors of 10 horsepower rating or less.
Availability
Service under this schedule is available at points on the Cooperative’s interconnected system where existing facilities of adequate capacity and desired phase and voltage are available, and additional investment by the Cooperative for new transmission, substation, or terminal facilities is not necessary to supply the desired service.
Meter Read
Meters will be read by the Cooperative beginning on the 24th of each month at midnight.
Monthly Charge
The Monthly Charge is the sum of the Access Charge and kWh charge at the following rates:
The monthly minimum charge shall be the Access Charge collected over 12 months.
Abandoned Service
Should a member’s service be physically disconnected for a continuous 12-month period, the Cooperative reserves the right to physically retire the service anytime thereafter.
Fees
Membership – $10
Disconnect Notice – $25
Returned Check – $20
Account Research/Special Handling – $30 per hour ($10 minimum)
Outages - Customer Equipment – Actual Cost
Account Activation – $15
Connect charge - Office hours – $25
Connect charge - Overtime hours – Actual Cost
Disconnect charge:
At member’s request – Office hours – $0
At member’s request – Overtime hours – Actual Cost
Idle Service Fee – Access Charge Billed Monthly
Other fees may apply under special circumstances.
A 1% franchise fee has been imposed by the City of Challis on all Cooperative members whose point of electric delivery is within the corporate boundaries of the City of Challis, Idaho. This fee will be collected by the Cooperative for the benefit of the City of Challis as specified by City of Challis ordinance.
Authorization Date: September 22, 2022 Issued By: Salmon River Electric Cooperative, Inc. Board of Directors Effective Date: December 25, 2022
This schedule is applicable to services that are single phase, standard voltage, and supplied through one point of delivery to a master-metered mobile home park or RV park for general domestic uses, including single phase motors of 10 horsepower rating or less.
Availability
Service under this schedule is available to master-metered mobile home parks and recreational vehicle (RV) parks at points on the Cooperative’s interconnected system where existing facilities of adequate capacity and desired phase and voltage are available, and additional investment by the Cooperative for new transmission, substation, or terminal facilities is not necessary to supply the desired service.
Meter Read
Meters will be read by the Cooperative beginning on the 24th of each month at midnight.
Monthly Charge
The Monthly Charge is the sum of the Access Charge and kWh charge at the following rates:
*Customer Class
Access Charge
Kilowatt-hour (kWh) Charge
SREC Rate Designation, Outside Challis City Limits
0 to 200
$52
$0.044 per kWh
441
201 to 400
$77
$0.044 per kWh
443
401 to 600
$102
$0.044 per kWh
445
601 to 800
$127
$0.044 per kWh
447
801 to 1000
$152
$0.044 per kWh
449
Note: *Customer Class is determined by the amperage rating of the customer's service entrance equipment. Amperages in excess of these amounts will be extrapolated.
Minimum Charge
The monthly minimum charge shall be the Access Charge collected over 12 months.
Abandoned Service
Should a member’s service be physically disconnected for a continuous 12-month period, the Cooperative reserves the right to physically retire the service anytime thereafter.
Fees
Membership – $10
Disconnect Notice – $25
Returned Check – $20
Account Research/Special Handling – $30 per hour ($10 minimum)
Outages - Customer Equipment – Actual Cost
Account Activation – $15
Connect charge - Office hours – $25
Connect charge - Overtime hours – Actual Cost
Disconnect charge:
At member’s request – Office hours – $0
At member’s request – Overtime hours – Actual Cost
Idle Service Fee – Access Charge Billed Monthly
Other fees may apply under special circumstances.
A 1% franchise fee has been imposed by the City of Challis on all Cooperative members whose point of electric delivery is within the corporate boundaries of the City of Challis, Idaho. This fee will be collected by the Cooperative for the benefit of the City of Challis as specified by City of Challis ordinance.
Authorization Date: September 22, 2022 Issued By: Salmon River Electric Cooperative, Inc. Board of Directors Effective Date: December 25, 2022
Service under this schedule is applicable to all three phase electric services less than 2500 kilowatts (kW) unless another rate schedule applies or is needed due to the uniqueness of the service requirements.
Availability
Service under this schedule is available at points on the Cooperative’s interconnected system where existing facilities of adequate capacity and desired phase and voltage are available, and additional investment by the Cooperative for new transmission, substation, or terminal facilities is not necessary to supply the desired service.
Meter Read
Meters will be read by the Cooperative beginning on the 24th of each month at midnight.
Billing Demand
The Billing Demand is the average kW supplied during the rolling 15-minute period at maximum use during the billing period
Phase Protection
The Cooperative will not be responsible for damage to member’s equipment caused by the loss of one or more phases serving member’s equipment. It is the member’s responsibility to obtain and install adequate phase protection for all three phase motors.
Monthly Charge
The Monthly Charge is the sum of the Access Charge and kWh charge at the following rates:
*Customer Class
Access Charge
Billing Demand
Kilowatt-hour (kWh) Charge
SREC Rate Designation
0 to 30 kW
$150
$2 per kW
$0.042 per kWh
720
31 to 90 kW
$440
$2 per kW
$0.042 per kWh
742
91 to 170 kW
$515
$2 per kW
$0.042 per kWh
744
Above 170 kW
$621
$2 per kW
$0.042 per kWh
748
Note: *Customer Class is determined by the amperage rating of the customer's service entrance equipment. Amperages in excess of these amounts will be extrapolated.
Minimum Charge
The monthly minimum charge shall be the Access Charge collected over 12 months.
Abandoned Service
Should a member’s service be physically disconnected for a continuous 12-month period, the Cooperative reserves the right to physically retire the service anytime thereafter.
Fees
Membership – $10
Disconnect Notice – $25
Returned Check – $20
Account Research/Special Handling – $30 per hour ($10 minimum)
Outages - Customer Equipment – Actual Cost
Account Activation – $15
Connect charge - Office hours – $25
Connect charge - Overtime hours – Actual Cost
Disconnect charge:
At member’s request – Office hours – $0
At member’s request – Overtime hours – Actual Cost
Idle Service Fee – Access Charge Billed Monthly
Other fees may apply under special circumstances.
A 1% franchise fee has been imposed by the City of Challis on all Cooperative members whose point of electric delivery is within the corporate boundaries of the City of Challis, Idaho. This fee will be collected by the Cooperative for the benefit of the City of Challis as specified by City of Challis ordinance.
Authorization Date: September 22, 2022 Issued By: Salmon River Electric Cooperative, Inc. Board of Directors Effective Date: December 25, 2022
This schedule is applicable to services that are single phase, standard voltage, and supplied through one point of delivery for general commercial use.
Availability
Service under this schedule is available at points on the Cooperative’s interconnected system where existing facilities of adequate capacity and desired phase and voltage are available, and additional investment by the Cooperative for new transmission, substation, or terminal facilities is not necessary to supply the desired service.
Meter Read
Meters will be read by the Cooperative beginning on the 24th of each month at midnight.
Monthly Charge
The Monthly Charge is the sum of the Access Charge and kWh charge at the following rates:
*Customer Class
Access Charge
Kilowatt-hour (kWh) Charge
SREC Rate Designation, Outside Challis City Limits
SREC Rate Designation, Within Challis City Limits
0 to 200
$54
$0.053
310
410
201 to 400
$79
$0.053
312
412
401 to 600
$104
$0.053
314
414
601 to 800
$129
$0.053
316
416
801 to 1000
$154
$0.053
318
418
1001 to 1200
$179
$0.053
321
421
1201 to 1400
$204
$0.053
323
423
1401 to 1600
$229
$0.053
325
425
Note: *Customer Class is determined by the amperage rating of the customer's service entrance equipment. Amperages in excess of these amounts will be extrapolated.
Minimum Charge
The monthly minimum charge shall be the Access Charge collected over 12 months.
Abandoned Service
Should a member’s service be physically disconnected for a continuous 12-month period, the Cooperative reserves the right to physically retire the service anytime thereafter.
Fees
Membership – $10
Disconnect Notice – $25
Returned Check – $20
Account Research/Special Handling – $30 per hour ($10 minimum)
Outages - Customer Equipment – Actual Cost
Account Activation – $15
Connect charge - Office hours – $25
Connect charge - Overtime hours – Actual Cost
Disconnect charge:
At member’s request – Office hours – $0
At member’s request – Overtime hours – Actual Cost
Idle Service Fee – Access Charge Billed Monthly
Other fees may apply under special circumstances.
A 1% franchise fee has been imposed by the City of Challis on all Cooperative members whose point of electric delivery is within the corporate boundaries of the City of Challis, Idaho. This fee will be collected by the Cooperative for the benefit of the City of Challis as specified by City of Challis ordinance.
Authorization Date: September 22, 2022 Issued By: Salmon River Electric Cooperative, Inc. Board of Directors Effective Date: December 25, 2022
Service under this schedule is available on a case by case basis and requires SREC management approval. Any city government member that is served from the Cooperative’s interconnected system where existing overhead secondary distribution facilities of adequate capacity, phase and voltage are present may be considered for this rate.
Applicability
Service under this schedule is applicable for electric energy provided for the outdoor dusk to dawn lighting of city government member owned lighting fixtures mounted on SREC poles and energized prior to any metering point. Lights must be controlled by a photoelectric relay.
Character of Service
Lighting fixture, wire leads, control relay, and mast for mounting the light on an existing Cooperative pole are purchased and owned by the city government member. Installation and maintenance, and repair (including lamp replacement) will be performed by the Cooperative and billed to the city government member at cost. Work will be performed during the regularly scheduled working hours of the Cooperative and the Cooperative will be allowed 72 hours subsequent to notification to perform such work. The city government member is responsible for maintaining any and all replacement inventory required for their light fixture. The city government member is not authorized at any time to perform any work on streetlights mounted to SREC utility poles. Lamps are energized each night providing approximately 4,105 hours of premises lighting per year.
A Memorandum of Understanding (MOU) outlining the details of the arrangement must be signed between the member and SREC prior to being eligible for this rate.
Monthly Charge
60 Watt LED – $3.50
80 Watt LED – $4.10
Minimum Charge
The monthly minimum charge shall be the Monthly Charge.
Other fees may apply under special circumstances.
A 1% franchise fee has been imposed by the City of Challis on all Cooperative members whose point of electric delivery is within the corporate boundaries of the City of Challis, Idaho. This fee will be collected by the Cooperative for the benefit of the City of Challis as specified by City of Challis ordinance.
Authorization Date: October 23, 2019 Issued By: Salmon River Electric Cooperative, Inc. Board of Directors Effective Date: October 23, 2019